Optimist
  • News
  • Sports
  • Opinion
    • Columns
    • Editorials
    • Letters to the Editor
  • Features
    • Book Review
  • Multimedia
    • Photo Galleries
    • Videos
  • Podcasts
    • Optimist Overtime
    • Top of the Key
  • Police Log
  • Print Edition
  • Projects
  • About
    • Advertise
    • Policies
    • Staff Contacts
    • Jobs
You are here: Home / News / Furniture to complete first phase this month

Furniture to complete first phase this month

January 18, 2008 by Colter Hettich

By Colter Hettich, Features Editor

With phase one of the Campus Center renovations nearing completion, the ACU community must wait only one more semester to enjoy the fully remodeled Bean.

“This will be the most dramatic transformation I’ve ever witnessed,” said Anthony William, director of retail and purchasing.

Williams assures students they will not be disappointed.

“We not only want to meet students expectations, but exceed them,” he said.

Phase one, which included the Hilton Food Court, two flat-panel televisions, an information desk, an ACU timeline above the post office boxes and an accent bench, lacks only furniture for the Campus Center lobby from being complete. Williams expects the furniture to arrive within the next two weeks.

Aramark, the university’s contracted food service, intends to wow students with its new, fresh approach to food preparation: Real Food On Campus.

RFOC strives to provide students with a “restaurant in a restaurant” experience by serving freshly prepared meals and produce.

In the fall of 2008, students can enjoy brick-oven pizza, sub sandwiches and baked goods, all prepared in plain view. The Bean will also feature what Williams considers a “sophisticated
salad bar with sautéed vegetables made while you wait.”

After the meal, customers will watch their dishes ride away on a conveyer belt.

“One thing students will appreciate is the new automated dish washing system. I think it is a very significant upgrade,” Williams said.

Phase two of the Bean’s construction will “begin when school is out at the very latest,” Mary Reyes, assistant to the vice president and special events coordinator, said. “But we are hoping for a quicker start date.”

Reyes serves on the Campus Center renovation committee along with nearly a dozen faculty members. The administration ensured student representation by appointing all Students’ Association officers to the committee. The committee has met together continually since the summer of 2007, and deliberations concerning the Bean have finally come to a close.

All construction documents have been approved, and the administration plans to meet with the architects and designers in the coming weeks.

With construction “moving right on schedule,” Williams cannot wait to unveil the finished product.

“Come August 2008; the Bean will be one of the better, aesthetic restaurants in the city of Abilene,” he said. “I think the students will be very pleased.”

Filed Under: News

Other News:

  • Gallery: Spring commencement honors 2021-22 graduates

  • New IM Fields location confirmed

  • At $250 million, Higher Ground aims to make impacts across campus

About Colter Hettich

You are here: Home / News / Furniture to complete first phase this month

Other News:

  • Gallery: Spring commencement honors 2021-22 graduates

  • New IM Fields location confirmed

  • At $250 million, Higher Ground aims to make impacts across campus

Follow us online

  • Facebook
  • Instagram
  • Twitter
  • YouTube

Optimist on Twitter

acuoptimist The Optimist @acuoptimist ·
4 May

"Maybe we just don’t care enough. But if we do start caring, and if we become the loudest fans in the WAC, let’s stick to supportive cheering." Read more from Guest Columnist Londyn Gray:
https://acuoptimist.com/2022/04/not-so-friendly-competition/

Reply on Twitter 1521918832738144257 Retweet on Twitter 1521918832738144257 1 Like on Twitter 1521918832738144257 8 Twitter 1521918832738144257
acuoptimist The Optimist @acuoptimist ·
3 May

Royce Clough and Jael Morel have been named as Mr. and Miss ACU for the class of 2022, a traditional honor voted on by the student body and awarded to two members of each graduating class.

Reply on Twitter 1521607087553458178 Retweet on Twitter 1521607087553458178 Like on Twitter 1521607087553458178 18 Twitter 1521607087553458178

Optimist on Facebook

The Optimist

4 months ago

The Optimist
"Maybe we just don’t care enough. But if we do start caring, and if we become the loudest fans in the WAC, let’s stick to supportive cheering." Read more from Guest Columnist Londyn Gray: ... See MoreSee Less

Not-so-friendly competition - Optimist

acuoptimist.com

BY: LONDYN GRAY “Number 18, you look like you don’t shower!” I chuckled and shrugged it off. “Londyn!” They had looked up the roster. “Do you even brush your teeth?” I laughed again, rol...
View on Facebook
· Share

Share on Facebook Share on Twitter Share on Linked In Share by Email

The Optimist

4 months ago

The Optimist
Cullen Auditorium is expected to be handed over to the university in June 2022, alongside a name change that coupled with the renovation will create new future for the Cornerstone class, Chapel and the Department of Theatre. ... See MoreSee Less

Cullen Auditorium still set for a name change alongside renovations - Optimist

acuoptimist.com

Cullen Auditorium is expected to be handed over to the university in June 2022, alongside a name change that coupled with the renovation will create new future for the Cornerstone class, Chapel and th...
View on Facebook
· Share

Share on Facebook Share on Twitter Share on Linked In Share by Email

Videos

Women’s tournament run ended by first-round exit against UTRGV

The Wildcats’ Western Athletic Conference tournament run and season came to a ... [Read More…]

  • Optimist Newscast Feb. 22. 2022
  • Optimist Newscast 2.16.2022
  • Optimist Newscast 2.9.2022

Latest Photos

  • Home
  • Weekly Ads
  • Classifieds

© 2022 ACU Optimist · All Rights Reserved