The Optimist
  • Home
  • About
    • Advertise
    • Policies
    • Staff Contacts
    • Jobs
  • News
  • Sports
  • Opinion
    • Columns
    • Editorials
  • Multimedia
    • Photo Galleries
    • Videos
  • Features
  • Print Edition
    • The Pessimist
    • Special Projects
  • Police Log
  • Classifieds
You are here: Home / News / Athletic field house construction begins

Athletic field house construction begins

August 27, 2008 by Colter Hettich

By Colter Hettich, Features Editor

Construction permeates the Edwards parking lot, but ACU women’s soccer and softball players do not need to complain because the demolition work will soon lead to the university’s newest addition to its athletic facilities-the one-story soccer/softball field house-soon to be located this spring in the old intramural field across the parking lot from Edwards Hall.

Plumbing and sewage construction for the field house began in Edwards parking lot two weeks ago and, if weather permits, should be completed next week.

“As soon as it quits raining and dries up a little bit, probably next week, the lot will be reopened and construction will begin in the grassy area,” Bob Nevill, director of physical resources, said. “We don’t know just yet when we’re going to resurface that portion of the lot, but it will be drivable.”

Nevill also said recent heavy rains have significantly delayed progress and pushed back the original completion date.

“Until the weather did us in, we were planning on finishing it by the start of the spring semester,” Nevill said. “But it will certainly be finished in the spring.”

Athletes and fans have much more to look forward to than locker rooms and showers in the new field house.

Jared Mosely, director of athletics, said in addition to locker rooms for women’s soccer and softball players, the structure will house a team classroom for meetings and film study, a satellite training room for treating injuries on location, two offices per sport, restrooms and a concession stand.

“This is a major facility we’ve had on our radar for a long time,” Mosley said. “We’ve done a lot of renovations and facility work. This is one project we’ve discussed needing and wanting to do for a long time, and several years ago we felt we needed to move forward with it,” he said.

All building and construction plans have been approved and finalized and Mosley said,” the funding is in place.” Mosley is confident the needed funds are available, although project coordinators are not sure how much of the final cost will be covered by fundraising and how much by “sources within current budget structures.”

“That’s still kind of a moving target,” Mosley said. “There’s a possibility we could have the entire project funded by donors, or it could be a combination. We’re continually fundraising for this project, and the university is comfortable with the plan that is covering [the costs].

Filed Under: News

Other News:

  • Concert culture shifts as students document more

  • Open letter resisting ‘Christian nationalism’ signed by over 1,000

  • ACU Gives raises $1.4 million in annual day of giving

About Colter Hettich

You are here: Home / News / Athletic field house construction begins

Other News:

  • Concert culture shifts as students document more

  • Open letter resisting ‘Christian nationalism’ signed by over 1,000

  • ACU Gives raises $1.4 million in annual day of giving

Follow us online

  • Facebook
  • Instagram
  • Twitter
  • YouTube

Optimist on Twitter

acuoptimist The Optimist @acuoptimist ·
9 May

BREAKING: The 2026 teacher of the year is Dr. Clint Buck, assistant professor of accounting in the College of Business Administration.

Reply on Twitter 2053158226070257771 Retweet on Twitter 2053158226070257771 Like on Twitter 2053158226070257771 2 Twitter 2053158226070257771
acuoptimist The Optimist @acuoptimist ·
4 May

BREAKING NEWS: James Bradshaw and Maddie Grace Fridge are the 2026 Mr. ACU and Miss ACU.

Reply on Twitter 2051110655172784350 Retweet on Twitter 2051110655172784350 Like on Twitter 2051110655172784350 4 Twitter 2051110655172784350

Optimist on Facebook

This message is only visible to admins.
Problem displaying Facebook posts.
Click to show error
Error: Server configuration issue Error: No posts available for this Facebook ID

Videos

Optimist Newscast Feb. 28, 2024

Our top stories today include a recap of The Musical Comedy Murders of 1940, the ... [Read More…]

  • Optimist Newscast Feb. 21, 2024
  • Optimist Newscast Feb. 14, 2024
  • Optimist Newscast Jan. 24, 2024

Latest Photos

  • Home
  • About
    • Contact
    • Subscribe
    • Policies
    • Advertising Policy
    • Letters to the Editor and Reader Comments
  • News
  • Sports
  • Opinion
    • Columns
    • Editorials
  • Multimedia
    • Videos
    • Photo Galleries
  • Features
  • Advertise
    • Paid Advertisement
  • Police Log

© 2026 ACU Optimist · All Rights Reserved