Optimist
  • News
  • Sports
  • Opinion
    • Columns
    • Editorials
    • Letters to the Editor
  • Features
    • Book Review
  • Multimedia
    • Photo Galleries
    • Videos
  • Podcasts
    • Optimist Overtime
    • Top of the Key
  • Police Log
  • Print Edition
  • Projects
  • About
    • Advertise
    • Policies
    • Staff Contacts
    • Jobs
You are here: Home / News / Preparations for recreation center soon under way

Preparations for recreation center soon under way

August 29, 2008 by Kelline Linton

By Kelline Linton, Chief Copy Editor

Construction has saturated the ACU campus lately from residence halls to the new Welcome Center, but the Gibson Health and P.E. Center has forever escaped the same fate, until now. Demolition begins for the ACU Student Wellness and Recreation Center roughly in the March/April timeframe, said Bob Nevill, director of physical resources.

The Gibson Center will retain most of its structure, but the interior space will be demolished and repurposed. The supporting structure and roof of the building are the only major components that will not change, and the new recreation center will be in the same general shape as the Gibson Center, a “t” form with the long leg tying into Moody Coliseum.

“But it will be larger, considerably; maybe 20,000 square feet larger,” Nevill said, “and it will be around 85,000 square feet when completed.”

The two-story building will have an additional pool that will connect to the existing pool already in the Gibson Center.

“It will be much more leisure oriented pool with maybe a Jacuzzi and lazy river,” Nevill said.

The building’s plans also include a climbing wall, basketball courts, free weight and aerobic areas, numerous gathering places and an indoor running track that encircles the second floor.

“You can look over the rail of the running track and see the basketball courts and the swimming pool down below,” Nevill said. “The idea is to have it much more open.”

The building design picks up elements from existing buildings around campus, like the standard brick most of them incorporate. One of the architecture firms designing the recreation center, Title Luther, also worked on the Welcome Center.

The university expects the building to be an inviting open structure, Nevill said.

“It should look like a state-of-the-art exercise facility,” he said.

The building designs also are green in most of the concepts.

“It’ll have a lot of ledes features about it,” Nevill said.

Once construction begins, it will take 18 to 20 months to completely finish, and the estimated cost of the new center is $15 million to $20 million, he said.

The building’s plans focus on student hangout places and building community on campus.

“The more ways we have for students to gather on campus in a social way has real value, it builds community,” Nevill said. “It’s all part of having a facility that enhances that student living experience.”

Filed Under: News Tagged With: Rec Center

Other News:

  • Gallery: Spring commencement honors 2021-22 graduates

  • New IM Fields location confirmed

  • At $250 million, Higher Ground aims to make impacts across campus

About Kelline Linton

You are here: Home / News / Preparations for recreation center soon under way

Other News:

  • Gallery: Spring commencement honors 2021-22 graduates

  • New IM Fields location confirmed

  • At $250 million, Higher Ground aims to make impacts across campus

Follow us online

  • Facebook
  • Instagram
  • Twitter
  • YouTube

Optimist on Twitter

acuoptimist The Optimist @acuoptimist ·
4 May

"Maybe we just don’t care enough. But if we do start caring, and if we become the loudest fans in the WAC, let’s stick to supportive cheering." Read more from Guest Columnist Londyn Gray:
https://acuoptimist.com/2022/04/not-so-friendly-competition/

Reply on Twitter 1521918832738144257 Retweet on Twitter 1521918832738144257 1 Like on Twitter 1521918832738144257 8 Twitter 1521918832738144257
acuoptimist The Optimist @acuoptimist ·
3 May

Royce Clough and Jael Morel have been named as Mr. and Miss ACU for the class of 2022, a traditional honor voted on by the student body and awarded to two members of each graduating class.

Reply on Twitter 1521607087553458178 Retweet on Twitter 1521607087553458178 Like on Twitter 1521607087553458178 18 Twitter 1521607087553458178

Optimist on Facebook

The Optimist

3 months ago

The Optimist
"Maybe we just don’t care enough. But if we do start caring, and if we become the loudest fans in the WAC, let’s stick to supportive cheering." Read more from Guest Columnist Londyn Gray: ... See MoreSee Less

Not-so-friendly competition - Optimist

acuoptimist.com

BY: LONDYN GRAY “Number 18, you look like you don’t shower!” I chuckled and shrugged it off. “Londyn!” They had looked up the roster. “Do you even brush your teeth?” I laughed again, rol...
View on Facebook
· Share

Share on Facebook Share on Twitter Share on Linked In Share by Email

The Optimist

3 months ago

The Optimist
Cullen Auditorium is expected to be handed over to the university in June 2022, alongside a name change that coupled with the renovation will create new future for the Cornerstone class, Chapel and the Department of Theatre. ... See MoreSee Less

Cullen Auditorium still set for a name change alongside renovations - Optimist

acuoptimist.com

Cullen Auditorium is expected to be handed over to the university in June 2022, alongside a name change that coupled with the renovation will create new future for the Cornerstone class, Chapel and th...
View on Facebook
· Share

Share on Facebook Share on Twitter Share on Linked In Share by Email

Videos

Women’s tournament run ended by first-round exit against UTRGV

The Wildcats’ Western Athletic Conference tournament run and season came to a ... [Read More…]

  • Optimist Newscast Feb. 22. 2022
  • Optimist Newscast 2.16.2022
  • Optimist Newscast 2.9.2022

Latest Photos

  • Home
  • Weekly Ads
  • Classifieds

© 2022 ACU Optimist · All Rights Reserved