The Optimist
  • Home
  • About
    • Advertise
    • Policies
    • Staff Contacts
    • Jobs
  • News
  • Sports
  • Opinion
    • Columns
    • Editorials
  • Multimedia
    • Photo Galleries
    • Videos
  • Features
  • Print Edition
    • The Pessimist
    • Special Projects
  • Police Log
  • Classifieds
You are here: Home / News / Lot construction outside res hall to end

Lot construction outside res hall to end

February 10, 2012 by Leigh Foith

The construction in the Gardner parking lot will be completed within the week, making the entire lot available for student parking.

The construction in the parking lot north of Gardner is associated with the heating and cooling for the building. The heating, ventilation and air-conditioning team discovered a leak in a pipe a few months ago, and the ACU Facilities Management dug up the pipe and fixed the leak over the Christmas break. The pipes began to leak in the same area a few weeks ago.

Kristian Allen, director of on-campus facilities management, made sure the leak will be fully repaired within the week so the parking lot will be fully accessible to students.

“We left it open until now to make sure that there were no more leaks, and it should be filled with road base within the week,” Allen said. “A permanent asphalt patch will be installed after the road base compacted, but the parking lot will be open.”

Emily Morrical, freshman family studies major from Wylie, feels the construction is a safety hazard for students and should be fixed as soon as possible.

“The construction is a complete inconvenience.” Morrical said.  “Instead of going straight through the parking lot, there is a road block of construction which leads to the dangerous reversing when looking for a parking spot.”

Filed Under: News Tagged With: Residence Halls

Other News:

  • Police Log: Hit-and-run collision under investitigation

  • Gallery: Cross country claims first and second place in annual Naimadu Classic

  • Reed begins semester as dean of Biblical studies

About Leigh Foith

You are here: Home / News / Lot construction outside res hall to end

Other News:

  • Police Log: Hit-and-run collision under investitigation

  • Gallery: Cross country claims first and second place in annual Naimadu Classic

  • Reed begins semester as dean of Biblical studies

Follow us online

  • Facebook
  • Instagram
  • Twitter
  • YouTube

Optimist on Twitter

acuoptimist

The Optimist

@acuoptimist ·
9 May

BREAKING: The 2026 teacher of the year is Dr. Clint Buck, assistant professor of accounting in the College of Business Administration.

Reply on Twitter 2053158226070257771 Retweet on Twitter 2053158226070257771 Like on Twitter 2053158226070257771 2 Twitter 2053158226070257771
acuoptimist

The Optimist

@acuoptimist ·
4 May

BREAKING NEWS: James Bradshaw and Maddie Grace Fridge are the 2026 Mr. ACU and Miss ACU.

Reply on Twitter 2051110655172784350 Retweet on Twitter 2051110655172784350 Like on Twitter 2051110655172784350 4 Twitter 2051110655172784350

Optimist on Facebook

This message is only visible to admins.
Problem displaying Facebook posts.
Click to show error
Error: Server configuration issue Error: No posts available for this Facebook ID

Videos

Optimist Newscast August 28, 2026

... [Read More…]

  • The Optimist 2026 Graduation Newscast
  • The Optimist 2026 Sing Song Newscast
  • Optimist Newscast Nov. 1, 2025

Latest Photos

  • Home
  • About
    • Contact
    • Subscribe
    • Policies
    • Advertising Policy
    • Letters to the Editor and Reader Comments
  • News
  • Sports
  • Opinion
    • Columns
    • Editorials
  • Multimedia
    • Videos
    • Photo Galleries
  • Features
  • Advertise
    • Paid Advertisement
  • Police Log

© 2026 ACU Optimist · All Rights Reserved