The Optimist
  • Home
  • About
    • Advertise
    • Policies
    • Staff Contacts
    • Jobs
  • News
  • Sports
  • Opinion
    • Columns
    • Editorials
  • Multimedia
    • Photo Galleries
    • Videos
  • Features
  • Print Edition
    • The Pessimist
    • Special Projects
  • Police Log
  • Classifieds
You are here: Home / Showcase / NEXT Lab receives approval for construction of molten salt reactor
ACU molten salt test system: NEXT Lab staff members work on the Natura Resources sponsored Molten Salt Test System. (Photo courtesy of Jeremy Enlow)

NEXT Lab receives approval for construction of molten salt reactor

September 27, 2024 by Ashley Henderson

The National Regulatory Commission (NRC) has issued the university a construction permit to build a liquid-fueled molten salt reactor (Natura MSR-1), which makes it the first university reactor approved in more than 30 years and the first reactor licensed by the NRC in American history. 

Dr. Kim Pamplin, NEXT Lab director of chemistry, said the reactor is not designed to produce power, but instead to demonstrate the safe operation of the technology. 

“In a few years after we have built and began to operate this reactor and have some data to demonstrate that it operates safely,” said Pamplin, professor of chemistry and biochemistry. “Then, the data from this reactor can be used by Natura Resources, who is our sponsoring organization, that they intend to build a commercial reactor.”

Pamplin said one of the biggest differences between this reactor and the available commercial reactors is that commercial reactors use water to carry heat away from the core of the reactor over to a facility that generates electricity. In the Natura MSR-1, the water is replaced with molten salt. 

“​​Commercial reactors operate around 300 degrees Celsius, and the molten salt reactor will operate around 600 degrees Celsius,” Pamplin said. “That allows the reactor to be much, much more efficient in the conversion of energy into electricity.”

Pamplin said the molten salt reactor also prevents significant dangers of a commercial reactor such as poking a hole in the pressurized water reactor system, which causes the 300 degrees Celsius water to leak out.

“That’s one of the things that happened in the Fukushima accident several years ago, and that would never happen with our reactor, because if you poke a hole in a molten salt reactor, the salt just drips down onto the floor and freezes,” Pamplin said. “It doesn’t flash to become a vapor and then spread around the world.”

The Natura MSR-1 (Photo courtesy of Natura Resources)

Natura Resources, an advanced nuclear development company, partnered with the NEXT Lab, Texas A&M University, The University of Texas at Austin and Georgia Institute of Technology to work on the reactor. 

The ACU team working on the reactor includes undergraduate students in engineering, physics, chemistry, biology and computer science majors. Dr. Phil Schubert, president of the university, said the NEXT Lab offers an incredible opportunity for these students to get hands-on experience. 

“It’s not an overstatement to say, students who are working on this project are getting experience that they couldn’t get anywhere else in the country,” Schubert said. “We are the only project currently in the U.S. that has a construction permit that’s been issued for a liquid-fueled molten salt reactor, and so they are pioneering new territory.”

Schubert said a long investment of time and energy has gone into this project. He said the university’s next steps will be building the reactor and submitting an operating application license. 

“We also need the NRC’S approval once it’s built to turn it on and operate it,” Schubert said. “That’s a separate process, and we will begin immediately putting the application together for that approval, which will come down the road once we get closer to the end of construction.”

A view of the research bay in the Dillard Science and Engineering Research Center at Abilene Christian University. (Photo courtesy of Jeremy Enlow)

Pamplin said the operating license will be a similar process to the construction license application, and it will undergo a completely new review. He said this will be submitted in early 2025, which will be likely followed by another 2-year process of review. 

“By the end of this year or early next year, we will have a completed engineering design for this reactor, which now with our construction permit, we can begin to build,” Pamplin said. “So while the NRC is considering our operating license application, we will be building the reactor.”

Schubert said that once the reactor is operational, the goal is for Natura to take ACU’s research and use it to support societal needs locally, domestically and internationally. 

“I would hope that this paves the way for changing the standard of living for populations all around the world,” Schubert said, “and that we would be kind of at the center of the spearhead, if you will, of making that happen.”

Filed Under: News, Showcase

Other News:

  • Saunders Center for Joy and Human Flourishing to have grand opening in fall 2026

  • University adds women’s club volleyball after years of student interest

  • Students watch early screening of ‘I Can Only Imagine 2’

About Ashley Henderson

You are here: Home / Showcase / NEXT Lab receives approval for construction of molten salt reactor

Other News:

  • Saunders Center for Joy and Human Flourishing to have grand opening in fall 2026

  • University adds women’s club volleyball after years of student interest

  • Students watch early screening of ‘I Can Only Imagine 2’

Follow us online

  • Facebook
  • Instagram
  • Twitter
  • YouTube

Optimist on Twitter

acuoptimist The Optimist @acuoptimist ·
30 Jan

REMINDER: The Texas voter registration deadline is on Monday for primary elections. Students can register in Abilene or at home.

Reply on Twitter 2017366178251886601 Retweet on Twitter 2017366178251886601 Like on Twitter 2017366178251886601 1 Twitter 2017366178251886601
acuoptimist The Optimist @acuoptimist ·
28 Jan

BREAKING NEWS: Classes and offices will return to normal operations on Thursday.

Reply on Twitter 2016637103761707025 Retweet on Twitter 2016637103761707025 Like on Twitter 2016637103761707025 Twitter 2016637103761707025

Optimist on Facebook

The Optimist

1 week ago

The Optimist
Check out this wider view of the snow on campus from our drone shots over the weekend!Wednesday classes will move to remote instruction, and offices will remain closed.🎥: Daniel Curd #acuoptimist #abilenechristianuniversity #winterstorm ... See MoreSee Less

Video

View on Facebook
· Share

Share on Facebook Share on Twitter Share on Linked In Share by Email

The Optimist

1 week ago

The Optimist
As snow covers campus, students have been outside having snowball fights and sledding using a variety of items such as laundry baskets and cardboard boxes. Our staff went out and captured the winter storm, which has cancelled classes for the second day in a row. To view the full photo gallery, visit acuoptimist.com or click the link in our bio. 📸: Daniel Curd, Callie Brimberry#acuoptimist #abilenechristianuniversity #photography #winterstormy ... See MoreSee Less

Photo

View on Facebook
· Share

Share on Facebook Share on Twitter Share on Linked In Share by Email

Videos

Optimist Newscast Feb. 28, 2024

Our top stories today include a recap of The Musical Comedy Murders of 1940, the ... [Read More…]

  • Optimist Newscast Feb. 21, 2024
  • Optimist Newscast Feb. 14, 2024
  • Optimist Newscast Jan. 24, 2024

Latest Photos

  • Home
  • About
    • Contact
    • Subscribe
    • Policies
    • Advertising Policy
    • Letters to the Editor and Reader Comments
  • News
  • Sports
  • Opinion
    • Columns
    • Editorials
  • Multimedia
    • Videos
    • Photo Galleries
  • Features
  • Advertise
    • Paid Advertisement
  • Police Log

© 2026 ACU Optimist · All Rights Reserved