The Optimist
  • Home
  • About
    • Advertise
    • Policies
    • Staff Contacts
    • Jobs
  • News
  • Sports
  • Opinion
    • Columns
    • Editorials
  • Multimedia
    • Photo Galleries
    • Videos
  • Features
  • Print Edition
    • The Pessimist
    • Special Projects
  • Police Log
  • Classifieds
You are here: Home / News / Parking frustration accompanies campus construction

Parking frustration accompanies campus construction

August 26, 2014 by Abigail Runnels

Parking on campus will be challenging due to the loss of spaces from construction.

The Vision in Action initiative is underway, beginning with construction next to Elmer Gray stadium and in Bennett Gymnasium.

While these new projects will be beneficial to the future of the university, they are only causing headaches right now.

“Students should expect problems with parking,” said Jimmy Ellison, ACU chief of police. “However, there should still be adequate parking for everyone on campus.”

Danielle Boyle, junior elementary education major from Atlanta, had trouble finding a parking spot on Monday.

“It took me quite a while to find a place to park,” Boyle said. “I had to walk further than I was hoping to get to class, so I’m glad I allowed for that extra time.”

There are already two major projects underway that began early this summer, each bringing with it a temporary loss of parking spaces.

Bennett Gymnasium, one of the oldest buildings on campus, is currently undergoing a 24,000 square foot remodel into a laboratory, workshop and teaching space. The construction started late last semester and is projected to cost $5 million.

About 30 parking spaces have been closed around Nelson Hall and the Phillips Education Building to accommodate construction. These spots are expected to reopen when the project is finished, Ellison said.

The second construction site is the new track and field and soccer stadium on Ambler Avenue. About 270 parking spots have been closed for this project. These include spots around Elmer Gray Stadium and the Oliver Jackson lot, which has been closed permanently. Around 120 of these spots are expected to reopen with the completion of the project.

In light of the loss of spots, Ellison expects more students to park to the south of campus.

“What we tell everybody is: expect maximum occupancy, arrive early, and be prepared to walk a little further than you might have had to walk last year,” Ellison said.

In addition, safety is important for all parties involved.

“Students are still required to park in appropriate parking,” Ellison said. “ACUPD recognizes it will be frustrating, but safety is important. We have to maintain emergency vehicle access at all times.”

Along with the frustration of finding a spot, the price for parking permits has also gone up from $10 to $20.

“We revisit the price of permits every few years and adjust it depending on funding needs and the price of permits at our sister schools,” Ellison said.

While the price of parking on campus may seem like a lot, ACU’s fee is low compared to other Texas schools. Texas A&M’s general student on-campus parking is $275, and Harding University has a higher fee at $280.

Ellison said the price of permits is expected to stay the same for at least a few years.

Filed Under: News

Other News:

  • Concert culture shifts as students document more

  • Open letter resisting ‘Christian nationalism’ signed by over 1,000

  • ACU Gives raises $1.4 million in annual day of giving

About Abigail Runnels

You are here: Home / News / Parking frustration accompanies campus construction

Other News:

  • Concert culture shifts as students document more

  • Open letter resisting ‘Christian nationalism’ signed by over 1,000

  • ACU Gives raises $1.4 million in annual day of giving

Follow us online

  • Facebook
  • Instagram
  • Twitter
  • YouTube

Optimist on Twitter

acuoptimist The Optimist @acuoptimist ·
9 May

BREAKING: The 2026 teacher of the year is Dr. Clint Buck, assistant professor of accounting in the College of Business Administration.

Reply on Twitter 2053158226070257771 Retweet on Twitter 2053158226070257771 Like on Twitter 2053158226070257771 2 Twitter 2053158226070257771
acuoptimist The Optimist @acuoptimist ·
4 May

BREAKING NEWS: James Bradshaw and Maddie Grace Fridge are the 2026 Mr. ACU and Miss ACU.

Reply on Twitter 2051110655172784350 Retweet on Twitter 2051110655172784350 Like on Twitter 2051110655172784350 4 Twitter 2051110655172784350

Optimist on Facebook

The Optimist updated their status.

4 weeks ago

The Optimist

This content isn't available right now

When this happens, it's usually because the owner only shared it with a small group of people, changed who can see it or it's been deleted.
View on Facebook
· Share

Share on Facebook Share on Twitter Share on Linked In Share by Email

The Optimist

1 month ago

The Optimist
Click the link in our bio to nominate a graduating senior for the Optimist to feature in our print issue. ... See MoreSee Less

Video

View on Facebook
· Share

Share on Facebook Share on Twitter Share on Linked In Share by Email

Videos

Optimist Newscast Feb. 28, 2024

Our top stories today include a recap of The Musical Comedy Murders of 1940, the ... [Read More…]

  • Optimist Newscast Feb. 21, 2024
  • Optimist Newscast Feb. 14, 2024
  • Optimist Newscast Jan. 24, 2024

Latest Photos

  • Home
  • About
    • Contact
    • Subscribe
    • Policies
    • Advertising Policy
    • Letters to the Editor and Reader Comments
  • News
  • Sports
  • Opinion
    • Columns
    • Editorials
  • Multimedia
    • Videos
    • Photo Galleries
  • Features
  • Advertise
    • Paid Advertisement
  • Police Log

© 2026 ACU Optimist · All Rights Reserved